Manassas Gap Railroad
The Shenandoah Valley Battlefields Foundation is raising funds to preserve the historic railroad from Front Royal to Broadway. Our Trails Plus proposal would keep the tracks and historic roadbed in place while adding a public trail for walking and biking.
A railroad through the Valley’s historic landscape
The roughly 49-mile corridor connects the Valley’s battlefields, historic towns and farmland. Preserving the rail line keeps their history visible and leaves room for future freight and excursion service.
Built in the 1850s, the Manassas Gap Railroad linked the Valley’s farming communities with northern Virginia. In 1861, Confederate troops traveled from the Valley by rail to reinforce the army at the First Battle of Manassas. National Park Service account of the First Battle of Manassas
The preservation corridor passes through or near Front Royal, Cedar Creek, Fisher’s Hill and Tom’s Brook. Keeping the rail alignment visible helps visitors understand how the railroad, the towns it served and the battlefields around it fit together. Shenandoah Valley Battlefields National Historic District
What rail with trail could offer
Freight options for farms and businesses
A short-line railroad could give Valley farms, agricultural suppliers and manufacturers another way to move bulk goods. A separate short line near Staunton already connects local shippers with larger railroads and serves a business that transfers fertilizer and wood between trucks and trains.
Excursion trains and heritage tourism
Scenic trains could give visitors a way to experience the historic railroad and spend time in Valley towns. In Staunton, Virginia Scenic Railway has paired a train ride with time downtown for passengers to visit shops, restaurants and historic sites.
A public trail for biking and walking
A trail alongside the tracks could give residents and visitors a place to ride or walk between communities, with opportunities to connect to battlefields, downtowns and local businesses. A state study identified demand for better walking and biking connections along the corridor.
Where the proposal stands
VDOT assessed what it would take to rehabilitate the tracks and bridges and build a trail alongside them. Virginia has directed acquisition negotiations, and the trail configuration remains undecided. Returning trains to the corridor would require rehabilitation, funding and an operator. VDOT’s rail-with-trail assessment
The federal Surface Transportation Board has postponed the effective date of Norfolk Southern’s proposed abandonment while the proceeding continues. Surface Transportation Board case status, docket AB 290 (Sub-No. 425X)
Support railroad preservation
Gifts help the Foundation plan and advocate for preserving the railroad and opening the corridor to the public.